01Lusail City, Qatar

LUSAIL Plaza Infrastructure, LRT Station & Underground Car Park

Lusail towers and waterfront in Qatar

Project overview

Major infrastructure package forming part of Lusail City development north of Doha. Included a 0.6 km underpass tunnel, 1.4 km approach troughs, underground car parks on east and west sides, and primary structural elements for a combined LRT station. Support of excavation systems extended approximately 30 m deep adjacent to an existing sea wall.

My role & contribution

  • Slope stability design for 6 million m3 excavation
  • Geotechnical supervision as independent third party
  • Design and implementation of geotechnical monitoring system
  • Inspection of cut slopes and design of remediation measures
  • Daily geotechnical inspection

At a glance

Duration
2013 - 2017
Client
Public Works Authority (Ashghal)
ExpertiseSlope StabilityDeep ExcavationGeotechnical MonitoringThird-Party Supervision

02Doha, Qatar

Dukhan Highway Central

Aerial view of the Dukhan Highway interchange in Qatar

Project overview

1.5 km tunnel and 2.2 km extension of Al Rufaa Street, forming part of Ashghal's Expressway Programme. The tunnel comprised 34 structural units with mechanical and electrical equipment including a central 24-hour control room. Approximately 450,000 m3 of material was excavated; 125,000 m3 of concrete and 10,000 tonnes of asphalt were used.

At a glance

Duration
2013 - 2017
Client
Public Works Authority (Ashghal) - Expressway Programme
ExpertiseTunnelHighwayGeotechnical Supervision

03K-town, Germany

Remediation of the rock slope along the Brandenburger street in Kaiserslautern, Germany

Engineering geological mapping

Project overview

A natural slope in silty soils was excavated with an angle of more than 60 degrees on a length of about 120m. After many rain falls successive slides were observed at the slope crone. The hazard was so big that the neighborhoods would be affected if urgent measures would not undertaken. A design of rehabilitation of the slope was performed considering several approaches such as shotcrete, soil reinforcement, bio engineering slope stabilization using Krismar system or ground improvement. Due to the special difficulties of this case such as nailing in silty soils and the rights of neighborhoods the ground improvement approach was selected, which considers also the costs of the remediation and the optical view of the slope after the remediation. As a ground improvement method the Hydro-Cementation approach using retaining slices and drainages in the slope was chosen.

My role & contribution

Designer, Site supervision, Project Manager

At a glance

Duration
6 month